About Sunnen About This Site Scrapbook E-Cards Staff Info Staff Alumni Info Contacts

Scrapbook
Events   |   Stories & Memories   |   Songs & Skits   |   Press Releases
Gone Too Soon   |   Staff Group photos   |   Photos & Patches   |   Links

SUNNEN IMAGES & PATCHES


Back To Listing

Sunnen Repairs Pictures - Post By: John Busch

The Point Benches 1 of 2
Benches at The Point

The Point Benches 2 of 2
Benches at The Point in dire need of repair. Activities have been canceled at The Point due to bench conditions.

Barrier Free Shower
Barrier Free Shower  exposed nails and rotting support must be replaced

Barrier Free Showers_2
Barrier Free Shower  another pic of rotting support which must be replaced

Bunk House Siding 2 of 2
Bunk House Close-up  siding separation requires at least sealing. Re-siding with Hardi-plank is preferred repair method.

Bunk House Siding 1 of 2
Bunk House  siding separation requires at least sealing. Re-siding with Hardi-plank is preferred repair method.



 

This is not an official BSA website. It is not affiliated with and/or sponsored by the BSA in any way.
Site maintained by John Busch (Staff 74-75).
Site written by Rob Hoffmann (Staff 97-00).
Site support by Ryan Frueh (Staff 93-96).
Infrastructure, design, and hosting by triCREATIVE.
To report errors or submit comments, please e-mail sunnen@robhoffmann.com